{"id":298,"date":"2016-12-27T12:00:00","date_gmt":"2016-12-27T12:00:00","guid":{"rendered":"https:\/\/www.soil-building.eu\/projecten\/de-hulst\/"},"modified":"2026-08-21T14:31:21","modified_gmt":"2026-08-21T14:31:21","slug":"de-hulst","status":"publish","type":"projecten","link":"https:\/\/www.soil-building.eu\/en\/projecten\/de-hulst\/","title":{"rendered":"From agricultural area to industrial estate"},"content":{"rendered":"<p class=\"translation-block\">A former agricultural area was developed into a new industrial estate in Willebroek. Soil &amp; Building stripped the topsoil and then filled the site with <strong>load-bearing soil<\/strong>. In total, <strong>around 950,000 m\u00b3 of soil<\/strong> was moved for this project.<\/p>","protected":false},"excerpt":{"rendered":"<p class=\"translation-block\">A former agricultural area was developed into a new industrial estate in Willebroek. Soil &amp; Building stripped the topsoil and then filled the site with <strong>load-bearing soil<\/strong>. In total, <strong>around 950,000 m\u00b3 of soil<\/strong> was moved for this project.<\/p>","protected":false},"featured_media":299,"template":"","class_list":["post-298","projecten","type-projecten","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/projecten\/298","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/projecten"}],"about":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/types\/projecten"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/media\/299"}],"wp:attachment":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/media?parent=298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}