{"id":306,"date":"2017-12-28T12:00:00","date_gmt":"2017-12-28T12:00:00","guid":{"rendered":"https:\/\/www.soil-building.eu\/projecten\/dhl-bornem\/"},"modified":"2026-08-21T14:31:21","modified_gmt":"2026-08-21T14:31:21","slug":"dhl-bornem","status":"publish","type":"projecten","link":"https:\/\/www.soil-building.eu\/en\/projecten\/dhl-bornem\/","title":{"rendered":"Infrastructure works for a 10-hectare storage facility"},"content":{"rendered":"<p class=\"translation-block\">Our team was brought in for <strong>almost all infrastructure works<\/strong> for the DHL warehouse in Bornem. We carried out works across the site\u2019s <strong>100,000 m\u00b2<\/strong>, including remediation and demolition of the former locks.<\/p>","protected":false},"excerpt":{"rendered":"<p class=\"translation-block\">Our team was brought in for <strong>almost all infrastructure works<\/strong> for the DHL warehouse in Bornem. We carried out works across the site\u2019s <strong>100,000 m\u00b2<\/strong>, including remediation and demolition of the former locks.<\/p>","protected":false},"featured_media":307,"template":"","class_list":["post-306","projecten","type-projecten","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/projecten\/306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/projecten"}],"about":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/types\/projecten"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/media\/307"}],"wp:attachment":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/media?parent=306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}