{"id":446,"date":"2026-10-14T07:49:04","date_gmt":"2026-10-14T07:49:04","guid":{"rendered":"https:\/\/www.soil-building.eu\/?post_type=projecten&#038;p=446"},"modified":"2026-10-15T07:29:49","modified_gmt":"2026-10-15T07:29:49","slug":"mg-park-venlo","status":"publish","type":"projecten","link":"https:\/\/www.soil-building.eu\/en\/projecten\/mg-park-venlo\/","title":{"rendered":"Sewers and infrastructure for MG Park Venlo"},"content":{"rendered":"<p class=\"translation-block\">Before this warehouse was built, our team carried out the infrastructure works, including the sewers. All around it you will find no less than <strong>20,000 m\u00b2 of infrastructure<\/strong> and around <strong>10,000 m\u00b2 of roads<\/strong> laid by Soil &amp; Building.<\/p>","protected":false},"excerpt":{"rendered":"<p class=\"translation-block\">Before this warehouse was built, our team carried out the infrastructure works, including the sewers. All around it you will find no less than <strong>20,000 m\u00b2 of infrastructure<\/strong> and around <strong>10,000 m\u00b2 of roads<\/strong> laid by Soil &amp; Building.<\/p>","protected":false},"featured_media":469,"template":"","class_list":["post-446","projecten","type-projecten","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/projecten\/446","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/projecten"}],"about":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/types\/projecten"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/media\/469"}],"wp:attachment":[{"href":"https:\/\/www.soil-building.eu\/en\/wp-json\/wp\/v2\/media?parent=446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}