Commissioned by Belgomine, Soil & Building removed a 50,000-litre tank that had contaminated the soil. Its position between a house and a warehouse, 6 metres underground and beneath a metal canopy, made the excavation considerably more difficult. We chose to work with shored trenches. In total, around 1,000 tonnes of contaminated soil were excavated and removed.