We redesigned the junction of Grote Kloosterstraat and the R22 to connect a new industrial zone. As part of this, we installed new, wider culverts measuring 1,000 mm wide and 20 metres long. To reduce the disruption to cyclists, we also put in a temporary cycle bridge. We also integrated a linked system of drainage channels that can collect water from higher-lying ground.