This project marked the debut of Soil & Building in Denmark. The custom-built FedEx logistics facility at Copenhagen Airport was delivered by MG in just six months. We laid a solid basis for the construction project with earthworks: stripping and removing the topsoil, stabilising the subsoil and then bringing in good-quality soil. We then installed the sewerage and were entrusted with the asphalt paving. Alongside these infrastructure works, we also built an entrance with an inner garden.