Westerman Multimodal Logistics is based in a building of almost 40,000 m², where rail wagons run straight into the warehouse. When the building was extended (by no less than 17,000 m²), Soil & Building connected the infrastructure. The project included 7,000 m² of paved outdoor area, a 2,500 m³ rainwater buffer and 630 metres of rainwater pipes.